ªñ´Á¬¡°Ê

¥»¤ë±Æ¦æ
  [0] BSMI will start to implement additional 2 test items in CNS 13438 beginning from 1st Oct 2010
[0] EC No 642/2009 requirements for on-mode power consumption become effective from 20 August 2010
 
¥»¤ë±Æ¦æ

IECEE proposed a specified transition period for the full implementation of BATT IEC62133
  Editor : wys  Edit Time : 2009/11/10 13:21:48 Click times : 685

In order to minimize the impact on Batteries and System manufacturer when implementing IEC 62133, IECEE proposed a 2-year specified transition period. Vendors shall follow the schedule when evaluating and verifying the safety of Battery Pack and Cell.

According to the requirement proposed by IECEE Certification Management Committee (CMC), vendors who applies for the CB certificate for Battery Pack and Cell products shall follow the specified transition schedule to ensure compliance with IEC 62133. (please see the attached file for complete content.)


Attachment Download (66KB):


Contact Information:
HwaYa Customer Service Dept.: +886-3-318-3232 (Brian Lee Ext.: 1636 brian@adt.com.tw)
Linkou Customer Service Dept.: +886-2-2605-2180 (Sandy Lin Ext.: 3117 sandy@adt.com.tw)
Hsinchu Customer Service Dept.: +886-3-593-5343 (Jet Lee Ext. 1717 jet_lee@adt.com.tw)
Safety Customer Service Dept.: +886-3-318-3232 (Clio Chang Ext.: 1814 clio_chang@adt.com.tw)
Mobile Product Customer Service Dept.: +886-3-318-3232 (Ching-I Chang Ext.: 1667 ci_chang@adt.com.tw)


Click for Chinese Version (¤¤¤åª©)

Associated News

Home |  About Us | Service |  Facilities |  Certificates |  Links  | Contact |  Chinese Page  |
Copyright 2000-2007 BUREAU VERITAS CONSUMER PRODUCTS SERVICES(HONG KONG) LIMITED, TAOYUAN BRANCH (formerly ADT). All Rights Reserved.
To download or copy any part of the databases, please get the written agreement by Bureau Veritas ADT
The copyright of linked title(s) or content(s) is owned by the original website.
For Comment, Please contact service.adt@tw.bureauveritas.com
Best Resolution : 1024 * 768
Best Brower : IE 6.0 above